Violation Detail
Standard Cited: 19100269 L08 V Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1445072.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,012.00
Current Penalty: $5,407.20
Issuance Date: 02/10/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/26/2020
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 03/27/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/27/2020 | $5,407.20 | 02/26/2020 | Serious | |
| Penalty | Z: Issued | 02/10/2020 | $9,012.00 | 02/26/2020 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.269(l)(8)(v): The employer did not ensure that each employee exposed to hazards from electric arcs wore protective clothing and other protective equipment that had an arc rating greater than or equal to the heat energy estimated under paragraph (l)(8)(ii) of this section whenever that estimate exceeded 2.0 Cal/cm2: (a) A.H. McCoy Federal Building Electrical Vault - On or about November 13, 2109 employees performing phasing a 480v circuit were exposed to an arc flash burn hazard. Employees were not wearing arc rated protective clothing.