Violation Detail
Standard Cited: 19260454 A Training requirements.
Inspection Nr: 1409150.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $9,282.00
Current Penalty: $4,641.00
Issuance Date: 12/09/2019
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 01/06/2020
Gravity: 10
Report ID: 0316700
Contest Date: 01/10/2020
Final Order: 04/05/2021
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 04/05/2021 | $4,641.00 | 01/06/2020 | Serious | |
Penalty | C: Contested | 01/21/2020 | $9,282.00 | 01/06/2020 | Serious | |
Penalty | Z: Issued | 12/09/2019 | $9,282.00 | 01/06/2020 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: a) Job Site - Employees working from mast climbing work platform (MCWP) scaffold systems were not trained in the recognition and avoidance of hazards associated with MCWP usage, on or about June 18, 2019 and times prior thereto. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.