Violation Detail
Standard Cited: 19100106 H07 III A Flammable liquids.
Inspection Nr: 1398632.015
Citation: 01003A
Citation Type: Willful
Abatement Date: 12/12/2019 2
Initial Penalty: $132,598.00
Current Penalty: $126,773.00
Issuance Date: 10/24/2019
Nr Instances: 3
Nr Exposed: 32
Related Event Code (REC):
Gravity: 10
Report ID: 0524200
Contest Date: 09/19/2019
Final Order: 11/08/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/08/2024 | $126,773.00 | 12/12/2019 | Willful | |
Penalty | C: Contested | 01/07/2020 | $132,598.00 | 12/12/2019 | Willful | |
Penalty | Z: Issued | 10/24/2019 | $132,598.00 | 12/12/2019 | Willful |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.106(h)(7)(iii)(a): All electrical wiring and equipment was not installed in accordance with subpart S of this part: The employer does not ensure that all equipment, wiring methods and installations of equipment are intrinsically safe, approved for hazardous (classified) locations or safe for use in the hazardous (classified) location. This condition last occurred between April 29, 2019 through May 3, 2019, when volatile flammable liquids were handled, processed, and used in reactor vessel R8. a) General purpose electrical fixtures, conduit, and wiring methods were used and installed in a Class 1 Division 2 location in the area around reactor R8 between April 29, 2019 through May 3, 2019. The electrical fixtures, conduit, and wiring methods were not intrinsically safe, approved for the hazardous (classified) location, or safe for the hazardous (classified) location. b) An electrical control panel was installed in a Class 1 Division 2 location, in the area around reactor R8, and was in this location from April 29, 2019 through May 3, 2019. The control panel and associated components were not intrinsically safe, approved for the hazardous (classified) location, or safe for the hazardous (classified) location. c) The wiring for a Lightnin Agitator Motor located in a Class 1 Division 2 hazardous (classified) location on Reactor R8, and was in this location from April 29, 2019 through May 3, 2019, was not intrinsically safe, approved for the hazardous (classified) location, or safe for the hazardous (classified) location.