Violation Detail
Standard Cited: 19100107 B02 Spray finishing using flammable and combustible materials.
Inspection Nr: 1380523.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,525.00
Current Penalty: $8,525.00
Issuance Date: 08/15/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/28/2020
Gravity: 5
Report ID: 0728500
Contest Date: 09/10/2019
Final Order: 03/30/2020
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/30/2020 | $8,525.00 | 02/28/2020 | Serious | |
Penalty | C: Contested | 09/12/2019 | $8,525.00 | 09/11/2019 | Serious | |
Penalty | Z: Issued | 08/15/2019 | $8,525.00 | 09/11/2019 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.107(b)(2): The interior surface of spray booth(s) were not smooth and continuous without edges and otherwise designed to prevent pocketing of residues and to facilitate cleaning and washing without injury: At a facility located at 1000 S Schifferdecker Ave, Joplin, MO: Employees were exposed to fire hazards. This was demonstrated on February 22, 2019 and on July 17, 2019 when residue was found to have accumulated on the interior of the spray booths at the facility. The employer failed to ensure that the interiors of the paint booths were kept smooth and free of an accumulation of residues.