Violation Detail
Standard Cited: 19260451 C01 General requirements.
Inspection Nr: 1356709.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,354.00
Current Penalty: $8,354.00
Issuance Date: 04/10/2019
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 04/18/2019
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order: 05/01/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/01/2019 | $8,354.00 | 04/18/2019 | Serious | |
Penalty | Z: Issued | 04/10/2019 | $8,354.00 | 04/18/2019 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.451(c)(1): Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) were not restrained from tipping by guying, tying, bracing, or equivalent means, as set forth in subparagraphs (i) - (iii) of this paragraph. Location: Jobsite Workers were exposed to the hazards of scaffolding collapse, where a tubular welded frame scaffold exceeded the 4:1 base to height ratio and was not restrained with guys, ties or braces.