Violation Detail
Standard Cited: 19260451 G04 I General requirements.
Inspection Nr: 1348139.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 02/01/2019 2
Initial Penalty: $9,054.00
Current Penalty: $9,054.00
Issuance Date: 01/07/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 01/28/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/28/2019 | $9,054.00 | 02/01/2019 | Serious | |
Penalty | Z: Issued | 01/07/2019 | $9,054.00 | 02/01/2019 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: Location: site On or about 9/22/18, an employee fell from an inadequately guarded scaffold.