Violation Detail
Standard Cited: 19260651 J02 Specific Excavation Requirements.
Inspection Nr: 1345325.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $5,174.00
Current Penalty: $5,174.00
Issuance Date: 11/15/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/12/2018
Gravity: 10
Report ID: 1032500
Contest Date:
Final Order: 12/12/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/12/2018 | $5,174.00 | 12/12/2018 | Serious | |
| Penalty | Z: Issued | 11/15/2018 | $5,174.00 | 12/12/2018 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.651(j)(2): Protection was not provided by placing and keeping excavated or other materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary: a) GPS Coordinates 44.087856-111.279521: On September 4, 2018, and at times prior thereto, excavated material (spoils) were not at least 2 feet back from the excavation along the north and south side of the trench. A 8-10' deep (wet) spoil pile weight would be approximately 17,800-33,000 pounds, exposing employees to crushing hazards and/or asphyxiation. Abatement certification and documentation ARE required for this item.