Violation Detail
Standard Cited: 19100119 D03 III Process safety management of highly hazardous chemicals.
Inspection Nr: 1312169.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,641.00
Current Penalty: $11,641.00
Issuance Date: 10/02/2018
Nr Instances: 1
Nr Exposed: 182
Abatement Date: 04/02/2021
Gravity: 10
Report ID: 0523900
Contest Date:
Final Order: 10/24/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/24/2018 | $11,641.00 | 04/02/2021 | Serious | |
Penalty | Z: Issued | 10/02/2018 | $11,641.00 | 02/21/2019 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.119(d)(3)(iii): For existing equipment designed and constructed in accordance with codes, standards, or practices no longer in general use, the employer did not determine and document that the equipment in the process was designed, maintained, inspected, tested, and operating in a safe manner (i.e. fit-for-service): a) On or about April 26, 2018, the employer failed to determine equipment constructed of ASTM A-212 steel was fit-for-service. Recommended Abatement: The employer will perform a fitness for service analysis on vessels constructed of A-212 steel in accordance with ASME Boiler and Pressure Code Section VIII, API 510, and API 579-1/ASME FFS-1, prior to returning them to service.