Violation Detail
Standard Cited: 19260451 F07 General requirements.
Inspection Nr: 1287604.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,174.00
Current Penalty: $3,600.00
Issuance Date: 06/27/2018
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 07/10/2018
Gravity: 10
Report ID: 0215000
Contest Date:
Final Order: 07/26/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/26/2018 | $3,600.00 | 07/10/2018 | Serious | |
| Penalty | Z: Issued | 06/27/2018 | $5,174.00 | 07/10/2018 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.451(f)(7): Scaffolds was not erected only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. a) West side of building: Employees were erecting 7-story-high supported scaffolds. The scaffolds were not erected under the supervision and direction of a competent person. Employees who were erecting the scaffolds were exposed to hazards, including but not limited to: fall hazard due to no competent person determine the feasibility and safety of providing fall protection, did not establish planking of at least 18 inches wide for employees to work from, and fall hazard from employees using cross braces as a means of access and egress. The employer did not have a competent person on site for the scaffold erection. On or about 01/10/18.