Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1277936.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,054.00
Current Penalty: $5,400.00
Issuance Date: 05/08/2018
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 05/23/2018
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 05/29/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/29/2018 | $5,400.00 | 05/23/2018 | Serious | |
Penalty | Z: Issued | 05/08/2018 | $9,054.00 | 05/23/2018 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): On or about November 16, 2017 employees working near pulleys were exposed to in-running nip point and entanglement hazards and the employer did not ensure that the equipment was guarded: a. The air compressor in the boiler room was running and two pulleys were not guarded. b. A pulley powering the radial stacker's conveyor belt on the south end of the machine was not guarded.