Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1253244.015
Citation: 01003A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $7,760.40
Issuance Date: 01/19/2018
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 08/24/2018
Gravity:
Report ID: 0728500
Contest Date: 01/19/2018
Final Order: 07/24/2018
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/24/2018 | $7,760.40 | 08/24/2018 | Other | |
Penalty | C: Contested | 04/24/2018 | $12,934.00 | 03/08/2018 | Serious | |
Penalty | Z: Issued | 01/19/2018 | $12,934.00 | 03/08/2018 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment: The employer is failing to protect employees from explosion and fire hazards by failing to establish and implement written procedures to maintain process equipment in the lead styphnate manufacturing process. This was most recently documented at 25201 E. 78 Hwy, Independence, Missouri, regrading the following equipment: a) Written procedures to ensure mechanical integrity of equipment were not established or implemented for the lead nitrate valve in the lead styphnate manufacturing process. b) Written procedures to ensure mechanical integrity of equipment were not established or implemented for the magnesium styphnate valve in the lead styphnate manufacturing process. c) Written procedures to ensure mechanical integrity of equipment were not established or implemented for the Delta V Control System Monitor and associated transmitting equipment, monitoring equipment for the lead styphnate manufacturing process.