Violation Detail
Standard Cited: 19260703 A01 Requirements for cast-in-place Concrete.
Inspection Nr: 1175381.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 03/13/2017 2
Initial Penalty: $12,675.00
Current Penalty: $12,675.00
Issuance Date: 03/01/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0418800
Contest Date: 03/01/2017
Final Order: 04/27/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 04/27/2021 | $12,675.00 | 03/13/2017 | Serious | |
Penalty | C: Contested | 03/17/2017 | $12,675.00 | 03/13/2017 | Serious | |
Penalty | Z: Issued | 03/01/2017 | $12,675.00 | 03/13/2017 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.703(a)(1): Formwork was not designed, fabricated, erected, supported, braced and maintained so that it would be capable of supporting without failure all vertical and lateral loads that could reasonably be anticipated to be applied to the form: On or about 9/01/2016, at the above addressed jobsite, the formwork was not designed to withstand vertical and lateral loads due to wind gust.