Violation Detail
Standard Cited: 19260651 K01 Specific Excavation Requirements.
Inspection Nr: 1080493.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,900.00
Current Penalty: $3,968.75
Issuance Date: 10/15/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 11/13/2015
Gravity: 10
Report ID: 0627500
Contest Date:
Final Order: 11/04/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/04/2015 | $3,968.75 | 11/13/2015 | Serious | |
| Penalty | Z: Issued | 10/15/2015 | $4,900.00 | 10/27/2015 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems: The employer did not ensure the excavation at the Gateway Storm Pond was inspected by a competent person prior to employees entering and working in the excavation. This condition exposed employees to cave-in and health hazards.