Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 993269.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 02/27/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/25/2015
Gravity: 10
Report ID: 0214500
Contest Date: 03/25/2015
Final Order: 06/25/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/25/2015 | $4,200.00 | 03/25/2015 | Serious | |
Penalty | C: Contested | 03/25/2015 | $7,000.00 | 03/25/2015 | Serious | |
Penalty | Z: Issued | 02/27/2015 | $7,000.00 | 03/25/2015 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Facility: The employer did not conduct a periodic inspection of the company energy control procedures on machines such as, but not limited to, the four Wickman Winding and Folding Machines, on or about 09/02/2014.