Violation Detail
Standard Cited: 19100179 L02 II Overhead and gantry cranes.
Inspection Nr: 950030.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,250.00
Current Penalty: $4,250.00
Issuance Date: 03/19/2014
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/25/2014
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 04/14/2014
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/14/2014 | $4,250.00 | 03/25/2014 | Serious | |
Penalty | Z: Issued | 03/19/2014 | $4,250.00 | 03/25/2014 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.179(l)(2)(ii): Cranes were operated before all guards had been removed, safety devices reactivated, and maintenance equipment was removed after adjustments and repairs had been made: (a) On or about 11/18/13 - at the Transfer Press area, the East crane was released for operation and operated before safety devices such as but not limited to the Magnetek Laser Guard (laser anti-collision sytem) were reactivated after a repair had been made.