Violation Detail
Standard Cited: 19100036 G02 Design and construction requirements for exit routes.
Inspection Nr: 941314.015
Citation: 01003
Citation Type: Serious
Abatement Date: 05/02/2014 2
Initial Penalty: $6,600.00
Current Penalty: $4,350.00
Issuance Date: 03/07/2014
Nr Instances: 2
Nr Exposed: 8
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 03/27/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/27/2014 | $4,350.00 | 05/02/2014 | Serious | |
Penalty | Z: Issued | 03/07/2014 | $6,600.00 | 04/02/2014 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.36(g)(2): Exit access(es) were not at least 28 inches (71.1 cm) wide at all points. On or about 9/11/13, at the 1 Lemon Lane, Atlanta facility, the employer did not ensure all egress paths from employee work stations were at least 28 inches wide. Instances included: 1 - At the output side of the tray wash area - egress was blocked by the tray conveyor and guardrails at the area and limited egress to 11 inches. 2 - At the Mixing station at IBL 3 - egress path to the stairs was blocked by product that is routinely set onto the platform for use and limited egress path to the stairs to 13 inches. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.