Violation Detail
Standard Cited: 19100333 B02 IV Selection and use of work practices
This violation item has been deleted.
Inspection Nr: 930523.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 01/09/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/05/2014
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 02/04/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/04/2014 | $0.00 | 02/05/2014 | Serious | |
| Penalty | Z: Issued | 01/09/2014 | $7,000.00 | 02/05/2014 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.333(b)(2)(iv): Verification of deenergized condition. The requirements of this paragraph shall be met before any circuits or equipment can be considered and worked as deenergized. (a) In the Motor Control Center (MCC) Switch Room, where preventative maintenance was being performed on high voltage switch gear where 13Kv was present, verification of the deenergized condition was not established exposing the employees to the hazard of electrical shock and arc-flash explosion as observed on or about August 16, 2013.