Standard Cited: 19100119 I01 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 926726.015
Citation: 01003
Citation Type: Serious
Abatement Date: 02/15/2014
Initial Penalty: $2,550.00
Current Penalty: $0.00
Issuance Date: 01/28/2014
Nr Instances: 1
Nr Exposed: 30
Related Event Code (REC):
Gravity: 1
Report ID: 0830500
Contest Date:
Final Order: 02/19/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/19/2014 | $0.00 | 02/15/2014 | Serious | |
Penalty | Z: Issued | 01/28/2014 | $2,550.00 | 02/15/2014 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.119(i)(1): The employer did not perform a pre-startup safety review for new facilities and for modified facilities when modification is significant enough to require a change in the process safety information: a) Enterprise Products Operating, LP at 27991 County Road 5, Rifle, CO 81650: On and before 7/30/13, the employer did not perform a pre-startup safety review for modified facilities when modification is significant enough to require a change in the process safety information in such but not limited to: 1) The employer changed the Meeker Gas Plant 1 & 2 instrument air low pressure trip logic and added a timer to the PALL trip to minimize unnecessary plant trip without performing a PSSR. 2) The employer was increasing the PAHH set points on PI1518 and 1525 from 70 psig to 150 psig on the first stage compressor without performing a PSSR. Abatement Note: Abatement certification is required for this item (see enclosed "Certification of Corrective Action Worksheet").