Violation Detail
Standard Cited: 19260251 A01 Rigging equipment for material handling.
Inspection Nr: 915205.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $4,500.00
Current Penalty: $1,000.00
Issuance Date: 12/18/2013
Nr Instances: 1
Nr Exposed: 19
Abatement Date: 03/01/2014
Gravity:
Report ID: 0625400
Contest Date:
Final Order: 01/23/2014
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/23/2014 | $1,000.00 | 03/01/2014 | Other | |
Penalty | Z: Issued | 12/18/2013 | $4,500.00 | 12/19/2013 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.251(a)(1): Rigging equipment for material handling was not inspected prior to use on each shift and as necessary during its use to ensure that it was safe and defective rigging equipment was not removed from service: On or about June 22, 2013 a 5/8 inch diameter wire rope sling, serial number 145270-23, 3.9 ton capacity had a hook safety latch that did not close. The sling was used to lift rafters, exposing employees to the hazards of being struck by falling materials. In the alternative: 29 CFR 1926.753(c)(5): Safety latches on hooks were deactivated or made inoperable: