Violation Detail
Standard Cited: 19100254 D09 II Arc welding and cutting.
Inspection Nr: 907789.015
Citation: 01003
Citation Type: Serious
Abatement Date: 11/19/2013 2
Initial Penalty: $5,500.00
Current Penalty: $3,200.00
Issuance Date: 11/12/2013
Nr Instances: 8
Nr Exposed: 10
Related Event Code (REC): C
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 12/04/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/04/2013 | $3,200.00 | 11/19/2013 | Serious | |
Penalty | Z: Issued | 11/12/2013 | $5,500.00 | 11/19/2013 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.254(d)(9)(ii): Machines which had become wet were not thoroughly dried and tested before being used: (a) Erection Way - During the period May 1 through May 30, 2013 welding machines exposed to rain were not thoroughly dried and tested prior to use.