Standard Cited: 19100269 D06 III Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 899400.015
Citation: 01003
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 05/31/2013
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 06/12/2013
Gravity: 10
Report ID: 0729300
Contest Date: 06/24/2013
Final Order: 07/18/2014
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/18/2014 | $0.00 | 06/12/2013 | Serious | |
Penalty | C: Contested | 06/27/2013 | $7,000.00 | 06/12/2013 | Serious | |
Penalty | Z: Issued | 05/31/2013 | $7,000.00 | 06/12/2013 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(d)(6)(iii): All energy isolating devices needed to control the energy to the machine or equipment were not physically located and/or operated in such a manner as to isolate the machine or equipment from energy sources: At the AMEREN-UE Calloway Nuclear Plant, switchyard, specifically at Bus B, 52-4, an arc flash occurred on or about 04/02/13 severely burning employees. All of the electrical energy isolating devices required to isolate Bus B, 52-4, were not physically located and/or operated prior to the employees attempting to place personnel protective grounds on connectors located inside of this piece of equipment.