Violation Detail
Standard Cited: 19100119 D03 I F Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 658198.015
Citation: 01003
Citation Type: Serious
Abatement Date: 05/03/2013 2
Initial Penalty: $6,300.00
Current Penalty: $0.00
Issuance Date: 03/19/2013
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0316700
Contest Date: 04/09/2013
Final Order: 02/07/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/07/2014 | $0.00 | 05/03/2013 | Serious | |
Penalty | C: Contested | 04/16/2013 | $6,300.00 | 05/03/2013 | Serious | |
Penalty | Z: Issued | 03/19/2013 | $6,300.00 | 05/03/2013 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.119(d)(3)(i)(F): The employer did not compile information pertaining to the equipment in the process in regards to design codes and the standards employed: a) Old Acid Room Area - The employer did not compile and utilize American Petroleum Institute (API) 570, "Piping Inspection Code: In-service Inspection, Rating,Repair, and Alteration of Piping Systems" in the process safety information (PSI) associated with the formaldehyde loading system, on or about September 26, 2012. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.