Violation Detail
Standard Cited: 19100303 G01 General.
Inspection Nr: 492659.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,800.00
Current Penalty: $1,960.00
Issuance Date: 08/10/2012
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0728500
Contest Date:
Final Order: 09/10/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/10/2012 | $1,960.00 | Serious | ||
Penalty | Z: Issued | 08/10/2012 | $2,800.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.303(g)(1): Sufficient access and working space was not provided and maintained about all electric equipment to permit ready and safe operation and maintenance of such equipment. (a) On, or before June 23, 2012, employees of RJD Group were exposed to hazard in the LTL and warehouse areas from failure to provide and maintain adequate working space in front of two 120 volt electrical panels, which were blocked by various tool carts and other equipment.