Violation Detail
Standard Cited: 19100119 E05 Process safety management of highly hazardous chemicals.
Inspection Nr: 315750901
Citation: 01003
Citation Type: Serious
Abatement Date: 05/08/2012 X
Initial Penalty: $4,500.00
Current Penalty: $2,295.00
Issuance Date: 04/05/2012
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 05
Report ID: 0213100
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/19/2012 | $2,295.00 | 05/08/2012 | Serious | |
Penalty | Z: Issued | 04/05/2012 | $4,500.00 | 05/08/2012 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard: CHEMNEP
29 CFR 1910.119(e)(5): the employer did not establish a system to assure that the process hazard analysis team's recommendations are resolved in a timely manner and that the resolution is documented: A)Worksite - On or about October 14, 2011, the employer had not completed all actions recommended by the 2009 process hazard analysis. The PHA stated that auto shutoffs would be installed on the 150 lb cylinder filling stations by December 31, 2009. This action was never completed. ABATEMENT CERTIFICATION AND DOCUMENTATION IS REQUIRED FOR THIS ITEM