Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 314847583
Citation: 01003
Citation Type: Serious
Abatement Status: X
Initial Penalty: $6,300.00
Current Penalty: $6,300.00
Issuance Date: 03/17/2011
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 05/03/2011
Gravity: 10
Report ID: 0524500
Contest Date: 04/25/2011
Final Order: 08/08/2011
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 08/08/2011 | $6,300.00 | 05/03/2011 | Serious | |
| Penalty | Z: Issued | 03/17/2011 | $6,300.00 | 05/03/2011 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard: CHEMNEP
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: At Incobrasa Industries, the employer did not establish and implement written procedures for items such as, but not limited to: a.Written procedures for inspection and inspection frequency to maintain the on going integrity of vessels and tanks in the facility; b.Written procedures for maintaining the on going integrity of piping in the Extraction Building; c.Written procedures for maintaining the instrumentation in the Extraction Building; d.Written procedures for maintaining the pumps in the facility; e.Written procedures for maintaining the on going integrity of the electrical process equipment and installations. ***Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d)***
Translate