Violation Detail
Standard Cited: 19100119 L02 II Process safety management of highly hazardous chemicals.
Inspection Nr: 314234055
Citation: 01003
Citation Type: Serious
Abatement Status: W
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 09/02/2011
Nr Instances: 1
Nr Exposed: 27
Abatement Date: 10/05/2011
Gravity: 10
Report ID: 0317000
Contest Date: 09/22/2011
Final Order: 04/18/2012
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 04/18/2012 | $7,000.00 | 10/05/2011 | Serious | |
| Penalty | Z: Issued | 09/02/2011 | $7,000.00 | 10/05/2011 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard: REFINERY
29 CFR 1910.119(l)(2)(ii): The written procedures to manage changes did not assure that the impact of the change on safety and health was addressed prior to any change: a) Jobsite: Marcus Hook Refinery, Plant 17 - On or about 04/25/2011, the written management of change procedures did not identify the safety and health impact of and the need for written emergency procedures for response to potential toxic exposures affecting the new blast resistant module. b) Jobsite: Marcus Hook Refinery, Plant 17 - On or about 4/25/2011, the written management of change procedures did not identify the safety and health impact of and the need for operating and emergency response procedures for the upgraded toxic and flammable gas detection system in the Plant 17 area.. NOTE: ABATEMENT DOCUMENTATION REQUIRED
Translate