Violation Detail
Standard Cited: 19100036 G02 Design and construction requirements for exit routes.
Inspection Nr: 313206575
Citation: 01003
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,500.00
Current Penalty: $2,500.00
Issuance Date: 08/26/2010
Nr Instances: 3
Nr Exposed: 4
Abatement Date: 09/07/2010
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
Translate