Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 312562325
Citation: 01003
Citation Type: Serious
Abatement Status: X
Initial Penalty: $400.00
Current Penalty: $400.00
Issuance Date: 01/14/2009
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 10/17/2008
Gravity:
Report ID: 1055340
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate