Violation Detail
Standard Cited: 19100119 F01 ID Process safety management of highly hazardous chemicals.
Inspection Nr: 311805519
Citation: 01003
Citation Type: Other
Abatement Status: W
Initial Penalty: $2,500.00
Current Penalty: $1,000.00
Issuance Date: 06/30/2009
Nr Instances: 1
Nr Exposed: 30
Abatement Date: 08/02/2009
Gravity: 03
Report ID: 0317300
Contest Date: 07/21/2009
Final Order: 08/12/2010
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/12/2010 | $1,000.00 | 08/02/2009 | Other | |
Penalty | Z: Issued | 06/30/2009 | $2,500.00 | 08/02/2009 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard: REFINERY
29 CFR 1910.119(f)(1)(i)(D): The employer's written operating procedures covering the steps for each operating phase did not address emergency shutdown including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown was done in a safe and timely manner: a) Unit 23 FCC - The employer did not ensure that the emergency shutdown procedures were adequate in that Emergency Shutdown Procedure (ESP) 051 did not specify an initiating condition, or conditions, under which this procedure would be required. This condition was noted on or about January 26, 2009. ABATEMENT DOCUMENTATION REQUIRED