Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 309486140
Citation: 01003
Citation Type: Serious
Abatement Status: X
Initial Penalty: $900.00
Current Penalty: $540.00
Issuance Date: 01/23/2006
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/18/2005
Gravity:
Report ID: 1055330
Contest Date: 02/03/2006
Final Order: 02/23/2006
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Y: State Decision | 02/23/2006 | $540.00 | 11/18/2005 | Serious | |
| Penalty | Z: Issued | 01/23/2006 | $900.00 | 11/18/2005 | Serious |
Translate