Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 190915.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,400.00
Current Penalty: $1,700.00
Issuance Date: 05/18/2012
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 1032500
Contest Date:
Final Order: 06/01/2012
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/01/2012 | $1,700.00 | Serious | ||
Penalty | Z: Issued | 05/18/2012 | $3,400.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.212(a)(1): Machine guarding was not provided to protect operator(s) and other employees from hazard(s) created by ingoing nip points: a.) Floor-Build Area: The set up and placement of the heat-duct machine de-coiler, exposed employees to the machine side that was not equipped with a steel plate barrier safety guard. Note: Abatement certification or documentation is NOT required for this item