Violation Detail
Standard Cited: 19100269 D08 III Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1845076.015
Citation: 01003
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,550.00
Current Penalty: $0.00
Issuance Date: 01/30/2026
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 02/26/2026
Gravity: 10
Report ID: 0830500
Contest Date: 02/26/2026
Final Order: 04/10/2026
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 04/10/2026 | $0.00 | 02/26/2026 | Serious | |
| Penalty | C: Contested | 02/26/2026 | $16,550.00 | 02/26/2026 | Serious | |
| Penalty | Z: Issued | 01/30/2026 | $16,550.00 | 02/26/2026 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(d)(8)(iii): Procedures shall be used during shift or personnel changes to ensure the continuity of lockout or tagout protection, including provision for the orderly transfer of lockout or tagout device protection between off-going and on-coming employees, to minimize their exposure to hazards from the unexpected energizing or start-up of the machine or equipment or from the release of stored energy: a) On or about August 18, 2025, the controlling employer did not ensure the authorized employee responsible for the lock-out/tag-out of the PCS 025 (SG4400UD-MV-US, Serial #T2520600152) requested removal or transfer of a lock-out tag-out device prior to leaving the site. This condition exposed employees to the hazard of un-expected energization of the equipment during maintenance activities.