Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1812503.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $6,620.00
Current Penalty: $0.00
Issuance Date: 08/01/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/29/2025
Gravity: 5
Report ID: 0523900
Contest Date:
Final Order: 09/10/2025
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/10/2025 | $0.00 | 08/29/2025 | Other | |
Penalty | Z: Issued | 08/01/2025 | $6,620.00 | 08/29/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: (a) Pallet making area; On or about March 18, 2025, and dates prior, the employer's general energy isolation (lockout/tagout) procedures did not identify specific step-by-step procedures for how to isolate each energy source on a woodpecker brand pallet nailing machine with integrated conveyances.