Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1811717.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,641.00
Current Penalty: $5,321.00
Issuance Date: 06/25/2025
Nr Instances: 1
Nr Exposed: 87
Abatement Date: 09/12/2025
Gravity: 5
Report ID: 0521700
Contest Date:
Final Order: 07/14/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/14/2025 | $5,321.00 | 09/12/2025 | Serious | |
Penalty | Z: Issued | 06/25/2025 | $10,641.00 | 08/12/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a. On March 19, 2025, in the warehouse, the employer did not ensure that the exit route door in the warehouse locks only from the outside. Failure to have such a locking device installed on exit door(s) can limit employees ability to escape the facility in the event of an emergency, potentially exposing them to fire hazards.