Violation Detail
Standard Cited: 19100303 B06 General.
Inspection Nr: 1807962.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,705.00
Current Penalty: $5,852.50
Issuance Date: 07/29/2025
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 08/22/2025
Gravity: 5
Report ID: 0111700
Contest Date:
Final Order: 08/28/2025
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/28/2025 | $5,852.50 | 08/22/2025 | Serious | |
Penalty | Z: Issued | 07/29/2025 | $11,705.00 | 08/22/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.303(b)(6):Conductors or equipment were located in damp or wet locations; where exposed to gases, fumes, vapors, liquids, or other agents that had a deteriorating effect on the conductors or equipment; were not identified for use in the operating environment: Extrusion Department, First Floor - Employees working near electrical panel DP1 were not protected from arc flash injuries where water was actively leaking onto and into the top of the panel causing corrosion to the electrical equipment.