Violation Detail
Standard Cited: 19100333 A01 Selection and use of work practices
Inspection Nr: 1807528.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,895.00
Current Penalty: $11,171.32
Issuance Date: 05/07/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/13/2025
Gravity: 10
Report ID: 0213100
Contest Date:
Final Order: 07/03/2025
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/03/2025 | $11,171.32 | 05/13/2025 | Serious | |
Penalty | Z: Issued | 05/07/2025 | $14,895.00 | 05/13/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.333(a)(1): Live parts to which an employee may be exposed were not deenergized before the employee worked on or was near to them: a) Main Service Panel - On or about February 26, 2025, an employee was exposed to live parts and arc flash hazards when working to install 2 Current Transformers (CTs) in the Main Service Panel (240 Volts) with a red wire that had damaged insulation exposing the wire to the edge of the Main Service Panel. The Main Service Panel was not deenergized prior to starting this work.