Violation Detail
Standard Cited: 19100269 U04 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1803752.015
Citation: 01003
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 08/05/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/29/2025
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 08/29/2025
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 08/05/2025 | $16,550.00 | 08/29/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(u)(4)(iii):Unqualified persons may not enter the rooms or other spaces while the electric supply lines or equipment are energized. On or about February 8, 2025 and at times prior to, at the NW, NE, SW and New Building Substations, employees of a subcontractor performing maintenance and testing on energized equipment were not prohibited from entering the room to perform their work assignment when equipment was energized.