Violation Detail
Standard Cited: 19100179 J02 Overhead and gantry cranes.
Inspection Nr: 1801508.015
Citation: 01003
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $11,823.00
Current Penalty: $0.00
Issuance Date: 05/01/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0729700
Contest Date:
Final Order: 05/27/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/27/2025 | $0.00 | Other | ||
| Penalty | Z: Issued | 05/01/2025 | $11,823.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.179(j)(2): The following items were not inspected for defects at intervals as defined in paragraph (j)(1)(ii) of this section or as specifically indicated, including observation during operation for any defects which might appear between regular inspections: Outside of W2 building on or about February 6, 2025, employee(s) engaged in overhead hoist activities were exposed to crush-by and/or struck-by hazards in that the employer did not perform frequent inspections of the Harrington 2 ton electric chain hoist.
Translate