Violation Detail
Standard Cited: 19260503 A01 Training requirements.
Inspection Nr: 1799726.015
Citation: 01003
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $11,585.00
Current Penalty: $11,585.00
Issuance Date: 05/08/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/28/2025
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 06/04/2025
Related Event Code (REC): I
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 05/08/2025 | $11,585.00 | 05/28/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: a) Lot 30 - On or about January 24, 2025, employees were sheathing the roof of a single-family multi-level home without the use of a means of fall protection and had not been trained on fall hazards or how to mitigate them. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.