Violation Detail
Standard Cited: 19100176 B Handling materials - general.
Inspection Nr: 1798106.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,093.00
Current Penalty: $4,255.80
Issuance Date: 06/26/2025
Nr Instances: 1
Nr Exposed: 25
Abatement Date: 08/13/2025
Gravity: 1
Report ID: 0418100
Contest Date:
Final Order: 07/21/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/21/2025 | $4,255.80 | 08/13/2025 | Other | |
| Penalty | Z: Issued | 06/26/2025 | $7,093.00 | 08/13/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.176(b): Storage of material created a hazard: a) Warehouse production racking system: On or about 01/07/2025, the employer exposed employees to trip and struck-by hazards from loose pipes, in that shelving pipe stops were not used on bottom shelving to keep galvanized pipe off the warehouse floor.