Violation Detail
Standard Cited: 19260702 H Requirements for equipment and tools.
Inspection Nr: 1793372.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,550.00
Current Penalty: $9,930.00
Issuance Date: 04/30/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/27/2025
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 05/30/2025
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/30/2025 | $9,930.00 | 05/27/2025 | Serious | |
| Penalty | Z: Issued | 04/30/2025 | $16,550.00 | 05/27/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.702(h): Bull float handles, used where they might contact energized electrical conductors, were not constructed of nonconductive material or insulated with a nonconductive sheath whose electrical and mechanical characteristics provided the equivalent protection of a handle constructed of nonconductive material. North Gate Ranch: December 9, 2024, employees utilized a bull float without it being constructed of nonconductive material or insulated with a nonconductive sheath while performing utility line work below a 14,400V overhead powerline.
Translate