Violation Detail
Standard Cited: 19100333 B02 II A Selection and use of work practices
Inspection Nr: 1791219.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,585.00
Current Penalty: $7,000.00
Issuance Date: 05/08/2025
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 05/23/2025
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 06/09/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/09/2025 | $7,000.00 | 05/23/2025 | Serious | |
Penalty | Z: Issued | 05/08/2025 | $11,585.00 | 05/23/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.333(b)(2)(ii)(A): Safe procedures for deenergizing circuits and equipment were not determined before circuits and equipment were deenergized. On or about December 3, 2024 employees working on or near energized circuits on the AntSpace HK3 V2 did not have safe procedures for deenergizing circuits and equipment.