Violation Detail
Standard Cited: 19260451 E09 IV General requirements.
This violation item has been deleted.
Inspection Nr: 1788627.015
Citation: 01003
Citation Type: Serious
Abatement Status:
Initial Penalty: $11,823.00
Current Penalty: $0.00
Issuance Date: 04/23/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/13/2025
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 05/19/2025
Related Event Code (REC): I
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/19/2025 | $0.00 | 05/13/2025 | Serious | |
Penalty | Z: Issued | 04/23/2025 | $11,823.00 | 05/13/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(e)(9)(iv): Cross braces on tubular welded frame scaffolds were used as a means of access or egress. (a) Quarryville Water Tank - While disassembling the supported scaffolding erected around the exterior of the water tank, an employee, working on the very top section of the scaffolding, climbed down the frame using the cross braces on the inside as footing to get from the top level to the next lower level before continuing to disassemble, on or about February 4, 2025. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.