Violation Detail
Standard Cited: 19100217 F02 Mechanical power presses.
Inspection Nr: 1780416.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,005.00
Current Penalty: $10,000.00
Issuance Date: 03/14/2025
Nr Instances: 2
Nr Exposed: 8
Abatement Date: 07/02/2025
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 04/07/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/07/2025 | $10,000.00 | 07/02/2025 | Other | |
Penalty | Z: Issued | 03/14/2025 | $13,005.00 | 04/30/2025 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.217(f)(2): Operation of power presses - Instruction to operators. The employer shall train and instruct the operator in the safe method of work before starting work on any operation covered by this section. The employer shall ensure by adequate supervision that correct operating procedures are being followed. a) On or about October 8, 2024, the employer did not ensure that employees operating the Seyi 330 ton press (D300-103 West) were adequately trained to understand that the purpose of supervisory control of the selector switch, in that the selector switch key was kept in the control panel during production. b) On or about October 30, 2024, the employer did not ensure that employees operating the Minster presses 2601 and 2602 were instructed in the safe method of work after modifications were made to the press that included the removal of the selector switch, and the addition of the new control panel, PLC (including the addition of safety input, and door guard switches).