Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1774260.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $9,500.00
Issuance Date: 11/25/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/30/2024
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 12/20/2024
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/20/2024 | $9,500.00 | 12/30/2024 | Serious | |
| Penalty | Z: Issued | 11/25/2024 | $16,131.00 | 12/30/2024 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(d)(3): Machine or equipment isolation. All energy isolating devices that are needed to control the energy to the machine or equipment shall be physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s). Location - Platform on roof of Fabric Filter #1 Building, #1 Deflation Fan. On or about 9/3/2024, the baghouse dampers connected to the #1 deflation fan were not physically locked out and tagged out with energy isolating devices prior to performing preventive maintenance on the #1 deflation fan. Stored energy within the dampers was not relieved, disconnected, restrained, and otherwise rendered safe.