Violation Detail
Standard Cited: 19260251 A02 III Rigging equipment for material handling.
Inspection Nr: 1751351.015
Citation: 01003
Citation Type: Other
Abatement Date: 12/24/2024 2
Initial Penalty: $8,296.00
Current Penalty: $8,296.00
Issuance Date: 11/27/2024
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 5
Report ID: 0625400
Contest Date:
Final Order: 12/23/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/23/2024 | $8,296.00 | 12/24/2024 | Other | |
Penalty | Z: Issued | 11/27/2024 | $8,296.00 | 12/24/2024 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.251(a)(2)(iii): The employer did not ensure that rigging equipment not be used without affixed, legible identification markings required by paragraph (a)(2)(I) of this section: On or about May 28, 2024, employees used a three leg chain sling to lift an 8,000 pound concrete drainage box that, at the time of the inspection, did not have an affixed, legible identification tag or marking.