Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1738506.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,676.00
Current Penalty: $6,338.00
Issuance Date: 08/06/2024
Nr Instances: 1
Nr Exposed: 100
Abatement Date: 08/28/2024
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 08/26/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/26/2024 | $6,338.00 | 08/28/2024 | Serious | |
| Penalty | Z: Issued | 08/06/2024 | $12,676.00 | 08/28/2024 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Dry Department - On or about April 17th, 2024, the employer did not conduct a periodic inspection of Lockout Tagout Procedure (Roto Chill Line 51) within the past year thereby exposing employees to mechanical hazards. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).