Violation Detail
Standard Cited: 19260651 K01 Specific Excavation Requirements.
Inspection Nr: 1724621.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,292.00
Current Penalty: $6,776.00
Issuance Date: 06/20/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 08/01/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/01/2024 | $6,776.00 | Serious | ||
Penalty | Z: Issued | 06/20/2024 | $11,292.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.651(k)(1): An inspection of the excavations, the adjacent areas, and protective systems was not conducted by the competent person prior to the start of work and as needed throughout the shift: a) On or about January 31, 2024, near trail hole number 6, employees worked inside an exaction repairing a drainage pipe before an inspection of the excavation and adjacent work area was performed by a competent person.