Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1708222.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $9,334.00
Issuance Date: 03/22/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/08/2024
Gravity: 10
Report ID: 0521400
Contest Date:
Final Order: 04/12/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/12/2024 | $9,334.00 | 04/08/2024 | Serious | |
Penalty | Z: Issued | 03/22/2024 | $16,131.00 | 04/08/2024 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(d):Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence: On or about October 27, 2023, the employer did not ensure that employees implemented energy control steps prior to performing maintenance activities on the APM, MRA- 26SS (SN 463) machine. Hazardous energy was not isolated prior to employees engaging in servicing and maintenance activities, exposing employees to crushing and amputation hazards. As a result, the remaining applicable energy control elements, involving machine isolation [1910.147(d)(3)], lockout/tagout device application [1910.147(d)(4)], dissipation of residual energy [1910.147(d)(5)(i)], and verification of isolation [1910.147(d)(6)] were not implemented to protect employees from machine hazards. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).