Violation Detail
Standard Cited: 19100303 H03 General.
Inspection Nr: 1697824.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 03/11/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0626000
Contest Date:
Final Order: 04/09/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/09/2024 | $16,131.00 | Serious | ||
Penalty | Z: Issued | 03/11/2024 | $16,131.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.303(h)(3): Energized parts of electric equipment rated over 600 volts, nominal, were exposed and the minimum clear work space was less than 3 feet wide (measured parallel to the equipment): On or about September 15, 2023, and at times prior thereto, the working space in between electrical switchboard panel and storage shelf for materials and chemicals was less than 3 feet. This condition exposed employees to burn and fire hazard in case of emergency.